Ruling Spans and Proper Conductor Sag

The cold winter weather of recent months has prompted many conversations about proper sagging and tension on transmission and distribution conductors. Improper sagging and excessively high tension on conductors – past their rated breaking strength – have caused unscheduled system outages, but such outages can be avoided by using the correct loading factors. The system will not fail when the correct tension and sagging factors are used, even in the coldest air.

Before we talk about calculating proper sag and tension, I want to share some relevant personal history. I remember the days when I first entered this industry. That was prior to OSHA’s existence and before we had much of the information that we have today regarding properly sagging conductors. At the time, I had never heard of a “ruling span,” and I didn’t know how that affected the method of determining correct sag on conductors. The work direction I received early in my career was, “Get all you can, three more clicks and make it up.” Of course, I was working in the South, and rarely did it get cold enough to damage the system, even when we sagged conductors too tightly. Back then, the appearance of the sag was thought to be the most important part. If it looked good, it would work fine.

As time marched on, the conductors became larger, and the weather seemed colder each winter. Then things started happening that we couldn’t explain, and no one ever gave us the details of the science behind proper sagging.

For example, there were times when the temperature would drop to 10 degrees Fahrenheit or lower. Insulators would break, pole-tops would break on dead-end poles, and conductors would literally pull out of dead-end clamps. In January 1984, the temperature dropped to -5 degrees in Macon, Georgia. At 1 a.m., there was a “C” suspension with a 379-ACSR conductor on a 45-foot Class 3 pole that had a 4-inch curved washer pull through the pole. The pole broke and dropped all three phases in the middle of a highway. At the same time, I was on a trouble call a few miles away, and a set of 1200-amp gang switches on 750-AAAC conductor pulled the switch apart and dropped everything on the ground. Other trouble cases that night were also the result of improper sagging. All the reconductoring to larger conductors had occurred the summer before. The larger conductors were installed and sagged in July. The ambient temperature that July was always in the 90s, and the conductor sagged in at around 2,100 pounds.

Factfinding
So, what is the science behind the sometimes destructive results of improper sagging and tension levels?

Well, what we were told back then – that “tight looks better” – was not actually the best-case scenario. In those days, I worked with linemen and supervisors who had no clue as to why all this was happening. They thought they knew how conductors should be sagged, but they never really understood the reasoning.

First and foremost, the size of the conductor, the length of the spans and the temperature the day the conductor is installed play an important role in how and at what tension the conductors are to be at final sag. Most of the previously mentioned failures were destined to occur at some time in the future; the only missing ingredient was the weather causing the conductors to fail due to improper installation.

We all want the system to look good after a job is complete. Improperly sagged conductors look ugly and can cause unnecessary outages. Today I see more conductors with too much slack or “baggy sag,” as it is sometimes referred to. I admit I still like to see a tighter pull.

Elevation of the total pull is another factor to consider. The final sag for equal tension may have to be made at both ends if the tensioner is set up on level ground, there is a mile or so of conductor to be installed, and the elevation changes near the beginning or end of the pull. This adds time to the job, but it is time well spent.

Continue Reading at Incident Prevention Magazine

For more from Incident Prevention Magazine, check out innovations in FR/AR clothing, solar backfeed safety, and the “Quail Effect.”

0 Comments

Submit a Comment

We’re more than just tool Sales

Check Out Our Unique Combination of Services

Tool & Equipment Rental

When new equipment purchases aren’t an option, Tallman Equipment’s tool rental department is here to meet your shorter-term needs! We house a large inventory of the most commonly used equipment for the construction and maintenance of electrical transmission and distribution systems.

Tool & Equipment Repair

We consider no tool to be outside the experience and training of our technicians. Some examples of commonly repaired tools include hydraulic, pneumatic, gas, and battery-powered equipment, stringing blocks, dynamometers, chain hoists, strap hoists, capstan hoists, and rope products.

Grounds & Jumpers
Manufacturing, repair and refurbishment 

Tallman Equipment has a full-service assembly department skilled in building and repairing custom grounds and jumpers. We can build customized grounds and jumpers to your specifications as quickly as a day. Our testing process meets ASTM standards

Rope Fabrication

& Rope Repair

Tallman leads the industry in developing and manufacturing transformer slings. Whatever your need may be, our trained and certified Master Splicer can build custom rope assemblies for unique applications, along with winch lines for buckets, diggers, bumper winches, and high strength tow ropes.

Fiberglass

Testing, Repair & Refinishing

Tallman offers complete repair and reconditioning of your fiberglass tools compliant with OSHA and ASTM standards. Our technicians can tackle all brands of hot sticks, conductor and support gins, ladders, extension arms, shotgun sticks, fixed sticks, and much more.

Rubber Goods
Cleaning & Testing 

Tallman is now offering rubber goods testing and cleaning of linemen’s rubber gloves, blankets, sleeves, hoods, line hose, and hardcover. All testing and procedures conform to ASTM standards and involve thorough washing, visual inspection, dielectric testing, and date stamping.