Why upgrading the grid doesn’t mean replacing everything old. Would you be surprised to learn that early lattice steel structures were not designed according to national standards? In the early days, each engineering firm followed its own unique design...
2024 was a busy year for the U.S. power sector with a number of significant policy advancements in renewables, transmission, nuclear energy and other areas. The year ahead will undoubtedly be an active one, too, as the sector navigates ongoing business challenges and...
MISO has proven itself as a national leader in regional transmission planning — and other regions should take note. There’s been a chant building across the energy sector the last several months, “build, baby, build.” With the historic approval of a record-setting...
The Biden administration is considering federal support for transmission development in certain areas, but many landowners have opposed the plan, including in Oklahoma and Kansas. The U.S. Department of Energy on Monday opened a 60-day public comment on three...
Utility workers face numerous challenges in their quest to build, maintain and improve infrastructure. One significant yet sometimes overlooked challenge is the risk associated with equipment instability. Crucial aspects of equipment setup include stabilization of the...
“Our Tranche 2.1 portfolio … is a major leap forward for the [Midcontinent Independent System Operator] footprint, and in particular our Midwest region,” MISO’s Jeremiah Doner said. MISO estimates that its Long Range Transmission Planning Tranche 2.1 projects will...